Contributing to SAASA’s expansion to Europe


The Peruvian firm SAASA has expanded its various logistic services successfully to Europe. With an investment of ~20 million Euros into their new Madrid Barajas International Airport 6000 m² warehouse on 14 000 m² site, they are well positioned to handle temperature-controlled cargo.

As a one-stop shop, we have designed, tendered and supervised the implementation of material handling equipment onsite. Thanks to Alvaro Salazar, Sonia Martin, and Oscar Moreno Rios, we could establish a smooth, effective project management.

This cargo facility convinces due to its:
– direct airside-landside connection for faster BUP transfer
– truck docks on both sides enabling more effective un-, loading
– cool rooms for temperature-sensitive goods
– workstations for safe build-, and break operations

Read more here: Grupo Andino arranca operaciones en España con terminal capaz de mover 80,000 toneladas al año | ECONOMIA | GESTIÓN


WordPress Cookie Plugin by Real Cookie Banner